Mission “It’s about time: we continually invest in innovation that saves time.” Utilizing cutting-edge tools, state-of-the-art equipment, and expertly trained/certified personnel, the mission at PSC Crane & Rigging is to continually invest in innova

PROJECT DESCRIPTION: Emergency Transformer Swap Out Load new unit to SPMT Transport from storage pad to beside new foundation Remove old unit from current foundation via jack & slide Set old unit to temporary storage pad Set new unit to permanent foundation via jack & slide Load old unit to SPMT and transport to designated scrapping area PROJECT HIGHTLIGHTS: Dimensions & weight –32’-5” L x 19’-10” W x 24’-6” 1,100,000 lbs. Emergency turnaround for swapping out of units to avoid warranty issue Transporting units through a live power plant Coordinated utility raising and removal with plant personnel Sliding of 1,000,000 lbs. fully assembled and oil-filled transformer
Skills Used:

PSC was contracted to provide the turnkey installation of a tandem press line consisting of: Four Servo drive-stamping presses One 2300-ton lead stage press Two 1600-ton intermediate stage presses One 1000-ton final stage press Dual moving bolsters per press Destack sheet feed system w/ sheet washer Robotic transfer system Automated tool-changing system End-of-line exit conveyors Auto-palletizing system Full sound enclosure & dust cover Turnkey installation included unloading, uncrating, mechanical assembly along with electrical wiring and piping connections to provide a fully operational system upon completion of our scope of work. Project Highlights: Used two hydraulic gantries SPMT trailer Multiple forklifts to 30-ton capacity Specialty tooling and rigging 24 super- and heavy-haul loads of press line components 107 legal loads of press Line components 444 cases of press line components 2,700 tons of freight (5.4 million pounds)
Skills Used: